Agenda item

Land Between Brewers Barn And The A601(M) North Road Carnforth Lancashire LA5 9LJ

Hybrid Application comprising a full application for the erection of 71 dwellings with associated vehicular access, incorporating a signalised junction, together with pedestrian and cycle access points, associated earthworks, roads, parking and drainage infrastructure and an outline application for the erection of up to 87 dwellings, including public open space provision and associated infrastructure.

Minutes:

A5

21/00899/HYB

Hybrid Application comprising a full application for the erection of 71 dwellings with associated vehicular access, incorporating a signalised junction, together with pedestrian and cycle access points, associated earthworks, roads, parking and drainage infrastructure and an outline application for the erection of up to 87 dwellings, including public open space provision and associated infrastructure.

Carnforth & Millhead Ward

A(106)

 

It was proposed by Councillor John Hanson and seconded by Councillor Tom Fish:

 

“That the hybrid application be approved subject to the conditions in the Committee Report.”

 

Upon being put to the vote, 15 Councillors voted in favour of the proposal with none against and no abstentions, whereupon the Chair declared the proposal to have been carried.

 

Resolved:

 

That the hybrid application be approved subject to:

 

a)    Full Planning Application:

 

the satisfactory completion of a Legal Agreement within 3 months of the date of this Committee meeting to cater for the provisions below, and in the event that a satisfactory Section 106 Agreement is not concluded within the timescale above, or other agreed extension of time, delegate authority to the Chief Officer – Planning and Climate Change to refuse planning permission on the grounds that the obligations which make the development acceptable have not been legally secured;

 

and subject to the following obligations:

 

·         PROW contribution (£15k).

·         Travel Plan contributions (£12k).

·         £71,867.85 towards outdoor sports facilities (provision of 3G pitch at Carnforth High School or alternative location in the town).

·         £31,780.00 towards young persons provision (provision towards facilities at Crag Bank POS) or provide on phase 2 land.

·         Details of provision of on-site equipped play area.

·         Provision of amenity space and ongoing management.

·         Biodiversity net gain that continues to demonstrate 10% net gain and a Landscape and Ecological Creation and Management Plan showing 30-year management.

·         Setting up of management company.

·         Management and Maintenance of all unadopted land, infrastructure and landscaping.

·         £337,173.90 Towpath contribution CART.

·         Provision of 21 affordable housing units.

 

and subject to the following conditions:

 

1.    Standard Time Limit (2 years).

2.    Approved Plans.

3.    Full details of the vehicular access details and access to be provided before construction of any other part of the development.

4.    Full details of the pedestrian/cycle connections to Whernside Grove, Carnforth Brow based on submitted drawings including timetable for implementation and use.

5.    Full details of the emergency access measures to prohibit general vehicular access at Whernside Grove and Carnforth Brow and ongoing management/maintenance including timetable for implementation and use.

6.    Full details of all off-site highway improvement works based on submitted drawings including timetable for implementation and use.

7.    Construction Method Statement including traffic management and protection of on-site infrastructure and requirements to meet policy DM30c.

8.    Construction Environmental Management Plan including protection of landscape features.

9.    Surface Water Construction Method Statement.

10.  Foul and Surface Water Drainage Scheme.

11.  Site Investigation and Remediation Strategy.

12.  Ecological Protection and Mitigation Scheme to be submitted based on the submitted PEA.

13.  Employment and Skills Plan.

14.  Precise details of noise mitigation measures based on updated assessment for approved layout.

15.  In accordance with AIA except for the requirement for updated protection plans for trees and hedgerows and method statements based on phased development (full and outline stages).

16.  Final finished floor levels and site levels and details of any retaining features (location, heights and appearance).

17.  Landscaping scheme.

18.  Parking plan to be submitted and agreed and thereafter retained for said purpose (including removal of garage PD rights where required).

19.  Submission of a Sustainable Design Statement including Energy and Carbon Statement to meet the requirements of policy DM30a and DM30b including the precise details of sustainable design measures/features.

20.  Details of external lighting.

21.  Details of all external materials to the dwellings.

22.  Details of all boundary treatments.

23.  Hard Landscaping scheme.

24.  Construction details of internal estate roads, private drives and driveways, including levels, retaining structures and any bridging details.

25.  Landscape Management Plan.

26.  Sustainable drainage system operation and maintenance manual.

27.  Verification report of constructed sustainable drainage system.

28.  Travel Plan.

29.  Homeowner Pack (HRA mitigation).

30.  Protection of visibility splays.

31.  M4(2) compliance.

32.  Development to accord with the mitigation set out in the FRA addendum in respect of Phase 1 only.

33.  Provision and retention of road turning facilities.

34.  Removal of PD rights (extensions, roof alterations, fencing and enclosures).

35.  No insertion of new windows and obscure glazing only to side facing windows to plots 1, 11, 17, 24, 28, 57 and 68-69.

 

and b) Outline Planning Application:

 

the satisfactory completion of a Legal Agreement within 3 months of the date of this Committee meeting to cater for the provisions below, and in the event that a satisfactory Section 106 Agreement is not concluded within the timescale above, or other agreed extension of time, delegate authority to the Chief Officer – Planning and Climate Change to refuse planning permission on the grounds that the obligations which make the development acceptable have not been legally secured;

 

and subject to the following obligations:

 

·         Provision of 30% affordable housing.

·         Provision of amenity space.

·         POS contribution towards outdoor sports facilities to be calculated at reserved matter stage.

·         Provision of Young persons play space on site or off-site contribution to be agreed at reserved matters stage.

·         Biodiversity net gain, including an updated metric at the time of a reserved matters application, that continues to demonstrate 10% net gain and a Landscape and Ecological Creation and Management Plan showing 30-year management.

·         Management and Maintenance of all unadopted land, infrastructure and landscaping.

 

and subject to the following conditions:

 

1.    Standard Time Limit (approval of reserved matters).

2.    Approved Plan (Location Plan and phase 2 plan only).

3.    Site plan and access drawings indicative only.

4.    Full access details showing connections to estate roads pursuant to the full planning application and connections to the canal towpath.

5.    Construction Method Statement including traffic management and protection of on-site infrastructure and compliance with policy DM30c.

6.    Construction Environmental Management Plan.

7.    Concurrent with the reserved matters application and prior to commencement of development a final detailed Flood Mitigation Scheme (based on the FRA Addendum) and informed by updated flood modelling to be submitted and agreed.

8.    Surface Water Construction Method Statement.

9.    Foul and Surface Water Drainage Scheme.

10.  Site Investigation and Remediation Strategy.

11.  No development within 10m of the tow of the canal embankment until a Risk Assessment and Method Statement (RAMS) outlining all works to be carried out adjacent to the canal to be submitted and agreed by the LPA.

12.  Ecological Protection and Mitigation Scheme to be submitted based on the submitted PEA including buffer to canal.

13.  Employment and Skills Plan.

14.  Submission of a Sustainable Design Statement including Energy and Carbon Statement to meet the requirements of policy DM30a and DM30b including the precise details of sustainable design measures/features.

15.  Commensurate with reserved matters, assessment of noise impacts and mitigation to be submitted and agreed and mitigation implemented before occupation.

16.  Commensurate with reserved matters, updated AIA to be provided with a scheme for tree and hedgerow protection and method statements.

17.  Finished Floor Levels and Site Levels.

18.  Housing Mix.

19.  Details of internal estate roads Construction details of internal estate roads, private drives and driveways, including levels, retaining structures and any bridging details.

20.  Details of external lighting.

21.  Sustainable drainage system operation and maintenance manual.

22.  Verification report of constructed sustainable drainage system.

23.  Travel Plan.

24.  Homeowner Pack (HRA mitigation).

25.  NDSS and M4(2) standards.

26.  No more than two dwellings within the IZ/IM of the pipeline.

27.  No facilities for outdoor use to be provided in the IZ/IM of the pipeline.

Supporting documents: