102 Central Promenade Regeneration Site Marine Road Central Morecambe Lancashire
PDF 404 KB
Demolition of existing buildings and proposed construction of major mixed leisure development in association with Eden Project (including use classes E, F1 and F2), outdoor arena (including live music performances), public realm, landscaping works, cycle parking, detached shelter and energy pods, and associated infrastructure and engineering operations (pursuant to the variation of condition 2 on planning permission 21/01113/FUL to amend the design and layout of the approved development).
Minutes:
|
A6 |
25/01118/VCN |
Demolition of existing buildings and proposed construction of major mixed leisure development in association with Eden Project (including use classes E, F1 and F2), outdoor arena (including live music performances), public realm, landscaping works, cycle parking, detached shelter and energy pods, and associated infrastructure and engineering operations (pursuant to the variation of condition 2 on planning permission 21/01113/FUL to amend the design and layout of the approved development). |
Poulton Ward |
A(106) |
A site visit was held in respect of this application on 9th February 2026 by Councillors Louise Belcher, Dave Brookes, Keith Budden, Alan Greenwell, John Livermore, Catherine Potter, Sandra Thornberry, Sue Tydesley and Paul Tynan. In attendance was Planning Applications Manager Jennifer Rehman and Principal Planning Officer Andrew Clement.
It was proposed by Councillor Robert Redfern and seconded by Councillor Louise Belcher:
“That the application be approved subject to the conditions in the Committee Report.”
Upon being put to the vote, 7 Councillors voted in favour of the proposal with none against and no abstentions, whereupon the Chair declared the proposal to have been carried.
Resolved:
That the application be approved subject to the following conditions:
· the satisfactory completion of a Legal Agreement within 3 months of the date of this Committee meeting, to cater for the provisions below. In the event that a satisfactory Section 106 Agreement is not concluded within the timescale above, or other agreed extension of time, to delegate authority to the Chief Officer – Planning and Climate Change to refuse planning permission on the grounds that the obligations which make the development acceptable have not been legally secured;
and the following obligations are required:
1. Submission, approval, implementation and monitoring of Full Travel Plan (for visitors, employees and large events/visitors), including details of funding for this.
2. Travel Plan Contribution to the sum of £10,000 (split over 5 years).
3. A Visitor Access and Parking Strategy comprising heads of terms unchanged from the original approval.
4. An Outreach and Education Plan comprising heads of terms unchanged from the original approval.
5. Delivery of the Flood Defence Wall through application 26/00023/FUL, implemented following commencement of building works within the ticketed areas, and full complete and operational prior to first use or operation of the major leisure attraction.
and subject to the following conditions:
1. Time Limit (5 years from 19 May 2022).
2. Approved Plans – varied proposed development.
3. Phasing Strategy (construction), control Phase 1.
4. Employment Skills Plan.
5. Construction Environment Management Plan (CEMP).
6. Traffic Management Plan (TMP) for construction.
7. Site Investigation (Remediation Strategy), including Phase 1.
8. Surface Water Drainage Scheme, including Phase 1.
9. Demolition and Construction Phase Surface Water Management Plan.
10. Foul Drainage Scheme.
11. Flood Risk Mitigation Scheme.
12. Geotechnical / structural assessment of the sea wall and details of any retaining structures adjacent to the highway.
13. Flood Management Plan.
14. Precise scheme for on-site renewable technology and energy efficient measures.
15. Details and samples (where relevant) of all external ... view the full minutes text for item 102