Issue - meetings

J Wedlake And Son Wheatfield Street Lancaster Lancashire

Meeting: 08/01/2024 - Planning Regulatory Committee (Item 86)

86 J Wedlake And Son Wheatfield Street Lancaster Lancashire pdf icon PDF 535 KB

Part retrospective application for relevant demolition of existing warehouse (B8), erection of 3-storey building comprising 16 1-bed studios for student accommodation (C3) and erection of a 3-storey building for student accommodation comprising 8 1-bed studios (C3), erection of a bin store, installation of drainage infrastructure and associated parking.

Minutes:

A5

23/00921/FUL

Part retrospective application for relevant demolition of existing warehouse (B8), erection of 3-storey building comprising 16 1-bed studios for student accommodation (C3) and erection of a 3-storey building for student accommodation comprising 8 1-bed studios (C3), erection of a bin store, installation of drainage infrastructure and associated parking.

Castle Ward

A

 

It was proposed by Councillor Martin Gawith and seconded by Councillor Keith Budden:

 

“That the application be approved subject to the conditions in the Committee Report.”

 

Upon being put to the vote, nine Councillors voted in favour of the proposal with noneagainst and three abstentions, whereupon the Chair declared the proposal to have been carried.

 

Resolved:

 

That the application be approved subject to the following conditions:

 

1.     Approved plans.

2.     Ventilation details.

3.     Details and sample of materials to be agreed – Stone walling, render, quoins, window surrounds, window and door details.

4.     Contaminated land assessment.

5.     Employment Skills Plan.

6.     Homeowner Information Packs.

7.     Provision of cycle storage.

8.     Security and lighting details.

9.     Provision of parking spaces.

10.  Provision of two 7.3kW electric vehicle charging points.

11.  Provision of bin storage facilities.

12.  Windows in accordance with noise assessment glazing specifications.

13.  Drainage Operation and Maintenance Plan.

14.  Drainage Verification Report.

15.  Surface water drainage strategy.

16.  Foul drainage strategy.

17.  Agreed material details.

18.  Landscaping details.

19.  AIA and approved tree works.

20.  Ecological mitigation measures.

21.  Hours of construction.

22.  Gated access arrangement set back a minimum of 5 metres from highway.

23.  Restriction to student accommodation.

24.  Restricted use to manager accommodation only.