Issue - meetings

Land East Of Arkholme Methodist Church Kirkby Lonsdale Road Arkholme

Meeting: 18/09/2023 - Planning Regulatory Committee (Item 50)

50 Land East Of Arkholme Methodist Church Kirkby Lonsdale Road Arkholme pdf icon PDF 334 KB

Outline application for the development of up to 23 residential dwellings and creation of a new access.

Additional documents:

Minutes:

A8

22/01463/OUT

Outline application for the development of up to 23 residential dwellings and creation of a new access.

Halton-with-Aughton and Kellet Ward

A

 

It was proposed by Councillor Sandra Thornberry and seconded by Councillor John Hanson:

 

“That the application be approved subject to the conditions in the Committee Report.”

 

Upon being put to the vote, 11 Councillors voted in favour of the proposal with none against and 1 abstention, whereupon the Chair declared the proposal to have been carried.

 

Resolved:

 

That the application be approved subject to the following conditions:

 

·         40% provision of affordable housing (percentage, size, type, phasing to be agreed at Reserved Matters stage based on local housing needs and the tenure of affordable homes split into 50/60% affordable/social rent and 50/40% intermediate tenure);

·         Detail, contribution and provision for open space (to be calculated at Reserved Matters Stage);

·         Biodiversity net gain, including an updated metric at the time of a reserved matters application, that continues to demonstrate 10% net gain and a Landscape and Ecological Creation and Management Plan showing 30 year management; and,

·         Provision for long term drainage, open space and landscaping/BNG, maintenance and management company;

 

- and subject to the following conditions:

 

1.    Timescale for commencement (2 years).

2.    Development in accordance with approved plans.

3.    Arboricultural Impact Assessment details, submission of Arboricultural Method Statement and Tree Protection Plan.

4.    Final surface water sustainable drainage strategy (SuDS).

5.    Foul water scheme.

6.    Finished site and floor levels (including gardens and open space).

7.    Full landscaping and ecological management plan.

8.    Ecology mitigation measures, including updated protected species appraisal.

9.    Full energy efficiency measures, at least 4% enhancement.

10.  Submission of an Employment and Skills Plan.

11.  Submission of construction management plan.

12.  Submission of construction surface water management plan.

13.  Full details of site access/footway/crossing/lighting.

14.  Contaminated land - following recommendations of the report.

15.  Boundary and surface treatments remove permitted development.

16.  Scheme for the full engineering, drainage and construction details of the internal estate roads.

17.  Off-site highway works, including pavements.

18.  Visibility splays.

19.  Sustainable drainage system operation and maintenance manual.

20.  Verification report of constructed sustainable drainage system.

21.  Scheme of archaeological work.

22.  Public right of way (PROW) connection scheme.

23.  Cycle and bin storage details.

24.  Housing mix address local need/policy.

25.  Requirements of M4(2) accessibility and adaptability.

26.  Nationally Described Space Standards.

27.  Limit up to 2 storey.