Issue - meetings

Development Land North Of Rectory Gardens Lancaster Road Cockerham

Meeting: 30/05/2023 - Planning Regulatory Committee (Item 8)

8 Development Land North Of Rectory Gardens Lancaster Road Cockerham pdf icon PDF 416 KB

Demolition of existing agricultural buildings and erection of 22 dwellings (C3) with associated garages, internal roads and open space.

Minutes:

A8

22/00618/FUL

Demolition of existing agricultural buildings and erection of 22 dwellings (C3) with associated garages, internal roads and open space.

Ellel Ward

A(106)

 

It was proposed by Councillor Keith Budden and seconded by Councillor Robert Redfern:

 

“That the application be approved subject to the conditions in the Committee Report.”

 

Upon being put to the vote, 13 Councillors voted in favour of the proposal with none against and 2 abstentions, whereupon the Chair declared the proposal to have been carried.

 

Resolved:

 

That the application be approved subject to the following Planning Obligations:

 

·       Provision of affordable housing (7 units on site, 4x affordable/social rent, 3x shared ownership tenure);

·       Open space provision (on-site amenity green space provision and financial contribution of £10,000 for young persons provision and £22,328.70 for outdoor sports in Cockerham);

·       Biodiversity net gain to demonstrate 10% net gain and a Landscape and Ecological Creation and Management Plan showing 30 year management;

·       Provision for long term drainage, open space and landscaping/BNG, maintenance and management company; and,

·       Contribution to Education (for two secondary school places) of £49,506 towards the permanent expansion of Ripley St Thomas C of E High School;

 

and subject to the following conditions:

 

1.     Timescale for commencement (2 years);

2.     Development in accordance with approved plans;

3.     Scheme of archaeological work ;

4.     Final surface water sustainable drainage strategy (SuDS);

5.     Foul water scheme;

6.     Finished site and floor levels (including gardens and open space) and M4(2) compliance;

7.     Full landscaping and ecological management plan;

8.     Ecology mitigation measures;

9.     Full energy efficiency measures;

10.  Submission of an Employment and Skills Plan;

11.  Submission of construction management plan;

12.  Submission of construction environmental management plan, including avoiding noise disturbance activities during wintering bird season;

13.  Submission of construction surface water management plan;

14.  Full details of site access/footway/lighting;

15.  Elevations and external treatment material details and samples;

16.  Contaminated land – further surveys following recommendations of the report;

17.  Boundary and surface treatments, method statement for such works within tree protection fencing area, remove permitted development;

18.  Site lighting scheme;

19.  Scheme for the full engineering, drainage and construction details of the internal estate roads;

20.  Off-site highway works, including pavements and bus shelter;

21.  Visibility splays;

22.  Sustainable drainage system operation and maintenance manual;

23.  Verification report of constructed sustainable drainage system;

24.  Obscure glazed openings 18 and 20;

25.  Cycle storage details;

26.  Waste bin provision details;

27.  Homeowner packs ecology;

28.  EV charging;

29.  Implementation of approved tree protection measures;

30.  Provide and control parking provision.