Issue - meetings

J Wedlake And Son Wheatfield Street Lancaster

Meeting: 11/10/2021 - Planning Regulatory Committee (Item 31)

31 J Wedlake And Son Wheatfield Street Lancaster pdf icon PDF 323 KB

Change of use and conversion of existing warehouse (B8) to student accommodation (C3) comprising of 16 1-bed studios, erection of 3-storey side extension, installation of dormer extensions, installation of new window and door openings, installation of rooflights and solar panels to the roof and erection of a 3-storey building for student accommodation comprising 8 1-bed studios with associated plant room and bin store and erection of a bin store and installation of drainage infrastructure.

Minutes:

A8

20/00964/FUL

Change of use and conversion of existing warehouse (B8) to student accommodation (C3) comprising of 16 1-bed studios, erection of 3-storey side extension, installation of dormer extensions, installation of new window and door openings, installation of rooflights and solar panels to the roof and erection of a 3-storey building for student accommodation comprising 8 1-bed studios with associated plant room and bin store and erection of a bin store and installation of drainage infrastructure.

Castle Ward

A

 

It was proposed by Councillor Robert Redfern and seconded by Councillor James Thomas:

 

“That the application be approved subject to the conditions set out in the Committee Report”

 

Upon being put to the vote, all 14 Councillors voted in favour, with none against, and none abstained, whereupon the Chair declared the proposal to be carried.

 

Resolved:

 

That the application be approved subject to the conditions set out in the Committee Report:

 

1.    Time limit.

2.    Approved plans.

3.    Detailed sustainable drainage strategy.

4.    Detailed foul drainage strategy.

5.    Contaminated land assessment.

6.    Employment Skills Plan.

7.    Details and samples of materials and details of fenestration, external walls, roofs, eaves and fascia, dormers, bin store and boundary treatments.

8.    Details of ventilation systems.

9.    Details of landscaping and associated maintenance.

10.  Details and provision of Homeowner packs and information boards.

11.  Details and provision of cycle storage.

12.  Provision of parking spaces.

13.  Provision of two 7.3kW electric vehicle charging points.

14.  Provision of bin storage facilities.

15.  Windows in accordance with noise assessment glazing specifications.

16.  Lighting details.

17.  Security details.

18.  Drainage Operation and Maintenance Plan and Verification Report.

19.  Approved tree works.

20.  Ecological mitigation measures.

21.  Hours of construction.

22.  Separate drainage.

23.  Gated access arrangement set back a minimum of 5 metres from highway.

24.  Restriction to student accommodation.