Issue - meetings

Land South Of Hala Carr Farm, Bowerham Road, Lancaster

Meeting: 04/02/2019 - Planning Regulatory Committee (Item 114)

114 Land South Of Hala Carr Farm, Bowerham Road, Lancaster pdf icon PDF 130 KB

Erection of 25 dwellings and creation of a new access and access roads (pursuant to the modification to condition 6 (ii) on planning permission 16/01551/FUL to remove the requirement for street lighting at the junction of Bowerham Lane and Kempton Road, and 6 (iii) to remove the requirement for a pedestrian refuge, together with the submission of details to satisfy conditions 3, 4, 5 and 6 (highways requirements), 7 (foul water drainage), 8 (finished floor levels), 9 (surface water drainage arrangements), 10 (noise mitigation), 11 (earth bund details), 12, 13 and 14 (materials)

Minutes:

A9

18/01413/VCN

Erection of 25 dwellings and creation of a new access and access roads (pursuant to the modification to condition 6 (ii) on planning permission 16/01551/FUL to remove the requirement for street lighting at the junction of Bowerham Lane and Kempton Road, and 6 (iii) to remove the requirement for a pedestrian refuge,  together with the submission of details to satisfy conditions 3, 4, 5 and 6 (highways requirements), 7 (foul water drainage), 8 (finished floor levels), 9 (surface water drainage arrangements), 10  (noise mitigation), 11 (earth bund details), 12, 13 and 14 (materials).

Scotforth East Ward

   A

 

Under the scheme of public participation, George Long spoke against the application and the applicant Chris Middlebrook spoke in support.

                                                                                        

It was proposed by Councillor Carla Brayshaw and seconded by Councillor Stuart Bateson:

 

“That the application be approved with delegated authority to the Planning Manager to finalise an agreement with the Highway Authority.”

 

Upon being put to the vote, 9 Members voted in favour of the proposition and 3 against, with 2 abstentions, whereupon the Chairman declared the proposal to be carried.

 

Resolved:

 

Subject to a Deed of Variation being signed and completed tying the permission to the obligations outlined within the existing Section 106, Planning Permission be granted subject to the following conditions with delegated authority to the Planning Manager to finalise an agreement with the Highway Authority:

 

1.

Timescales development commence by 14 June 2021.

2.

Approved plans.

3.

Access detail.

4.

Construction Risk Method Statement in connection with water main.

5.

Construction Method Statement.

6.

Off-site highway improvement.

7.

Foul drainage.

8.

Finished floor levels.

9.

Surface water drainage measures.

10.

Noise mitigation.

11.

Earth bund details.

12.

Hard and soft landscaping.

13.

Material samples.

14.

Boundary treatments.

15.

Development in accordance with the approved AIA.

16.

Bird breeding season protection.

17.

Protection of visibility splays.

18.

Car parking spaces provided.

19.

Removal of Permitted Development rights.