100 Lancaster Leisure Park, Wyresdale Road, Lancaster
PDF 170 KB
Erection of 71 dwellings including associated
parking and landscaping (pursuant to the variation of condition 2
on planning permission 12/01109/FUL to vary the amended plans) for
Mr Simon Jones
Minutes:
|
16/01183/VCN |
Erection of 71 dwellings including associated parking and landscaping (pursuant to the variation of condition 2 on planning permission 12/01109/FUL to vary the amended plans) for Mr Simon Jones |
John O’Gaunt Ward |
A |
A site visit took place in respect of this item on 18th July 2016, minute 33 (2016/2017) refers.
It was proposed by Councillor Dave Brookes and seconded by Councillor Claire Cozler:
“That the application be approved.”
Upon being put to the vote, Members voted unanimously in favour of the proposition, whereupon the Chairman declared the proposal to be carried.
Resolved:
That Planning Permission be granted subject to the signing and completion of a Deed of Variation and the following conditions (though if the Deed is not signed and completed on or prior to the determination date the application is to be refused):
|
1. |
Standard 3 year timescale – Remove |
|
2. |
Development in accordance with approved plans – Amend |
|
3. |
Materials - elevational and roof, surface and site/plot boundary treatments –Revise |
|
4. |
Sustainable construction - affordable housing to meet at least Code level 3 and open market housing to exceed Building Regulations 2010 Part L levels by at least 10% - Retain |
|
5. |
Highway access - details required to Lancashire's adoptable standards – Amend |
|
6. |
Visibility splays - provision and protection – Retain |
|
7. |
Off-site highway works: - cycle improvements along Wyresdale Road - upgrades of the closest bus stops to Quality Bus Stops - Traffic Regulatory Order for the extension of the existing 30mph zone along Wyresdale Road - reconfiguration of kerb lines at the junction within Wyresdale Road / Coulston Road - traffic calming gateway to Wyresdale Road including pedestrian refuse and street lighting Amend |
|
8. |
Construction Method Statement incl. dust control and wheel cleaning facilities – Amend |
|
9. |
Separate drainage system – Retain |
|
10. |
Development to be carried out in accordance with revised (10 October 2013) FRA and Drainage Strategy Report – Retain |
|
11. |
Scheme for surface water drainage to be designed to a 1 in 100 year plus climate change critical storm to prevent risk of flooding off site – Amend |
|
12. |
Tree protection plan – Amend |
|
13. |
Arboricultural Method Statement and Tree Works Schedule – Amend |
|
14. |
Landscaping scheme - details required. To be maintained at all times thereafter – Amend |
|
15. |
Public open space and equipped play area provision - details required. To be maintained at all times thereafter – Amend |
|
16. |
No pile driving – Retain |
|
17. |
Hours of construction - 0800-1800 Mon to Fri and 0800-1400 Sat only – Retain |
|
18. |
Standard land contamination condition – Amend |
|
19. |
Prevention of new contamination – Amend |
|
20. |
Importation of soil, materials and hardcore – Amend |
|
21. |
Bunding of tanks – Amend |
|
22. |
Ecology Measures - Retain |
|
23. |
Garages solely used for vehicles – Retain |
|
24. |
Cycle Storage / Bin Store– Amend |
|
25. |
Car Parking Areas brought into use –Retain |
|
26. |
Travel Plan – Retain |
|
27. |
In accordance with Noise Mitigation - Retain |