Issue - meetings

Lancaster Leisure Park, Wyresdale Road, Lancaster

Meeting: 12/12/2016 - Planning Regulatory Committee (Item 100)

100 Lancaster Leisure Park, Wyresdale Road, Lancaster pdf icon PDF 170 KB

Erection of 71 dwellings including associated parking and landscaping (pursuant to the variation of condition 2 on planning permission 12/01109/FUL to vary the amended plans) for Mr Simon Jones

Minutes:

A7

16/01183/VCN

Erection of 71 dwellings including associated parking and landscaping (pursuant to the variation of condition 2 on planning permission 12/01109/FUL to vary the amended plans) for Mr Simon Jones

John O’Gaunt Ward

        A

 

A site visit took place in respect of this item on 18th July 2016, minute 33 (2016/2017) refers.

 

It was proposed by Councillor Dave Brookes and seconded by Councillor Claire Cozler:

 

“That the application be approved.”

 

Upon being put to the vote, Members voted unanimously in favour of the proposition, whereupon the Chairman declared the proposal to be carried.

 

Resolved:

 

That Planning Permission be granted subject to the signing and completion of a Deed of Variation and the following conditions (though if the Deed is not signed and completed on or prior to the determination date the application is to be refused):

 

1.

Standard 3 year timescale – Remove

2.

Development in accordance with approved plans – Amend

3.

Materials - elevational and roof, surface and site/plot boundary treatments –Revise

4.

Sustainable construction - affordable housing to meet at least Code level 3 and open market housing to exceed Building Regulations 2010 Part L levels by at least 10% - Retain

5.

Highway access - details required to Lancashire's adoptable standards – Amend

6.

Visibility splays - provision and protection – Retain 

7.

Off-site highway works:

- cycle improvements along Wyresdale Road

- upgrades of the closest bus stops to Quality Bus Stops

- Traffic Regulatory Order for the extension of the existing 30mph zone along Wyresdale Road

- reconfiguration of kerb lines at the junction within Wyresdale Road / Coulston Road

- traffic calming gateway to Wyresdale Road including pedestrian refuse and street lighting Amend

8.

Construction Method Statement incl. dust control and wheel cleaning facilities – Amend

9.

Separate drainage system – Retain

10.

Development to be carried out in accordance with revised (10 October 2013) FRA and Drainage Strategy Report – Retain

11.

Scheme for surface water drainage to be designed to a 1 in 100 year plus climate change critical storm to prevent risk of flooding off site – Amend

12.

Tree protection plan – Amend

13.

Arboricultural Method Statement and Tree Works Schedule – Amend

14.

Landscaping scheme - details required.  To be maintained at all times thereafter – Amend

15.

Public open space and equipped play area provision - details required.  To be maintained at all times thereafter – Amend

16.

No pile driving – Retain

17.

Hours of construction - 0800-1800 Mon to Fri and 0800-1400 Sat only – Retain

18.

Standard land contamination condition – Amend

19.

Prevention of new contamination – Amend

20.

Importation of soil, materials and hardcoreAmend

21.

Bunding of tanks – Amend

22.

Ecology Measures  - Retain

23.

Garages solely used for vehicles – Retain

24.

Cycle Storage / Bin Store– Amend

25.

Car Parking Areas brought into use –Retain

26.

Travel Plan – Retain

27.

In accordance with Noise Mitigation - Retain