99 23 - 25 North Road, Lancaster
PDF 240 KB
Listed building application for internal and
external alterations to facilitate the phased change of use and
conversion of bar, nightclub and shop (A1/A4) to student
accommodation comprising four 7-bed, two 8-bed and one 9-bed
cluster flats (sui generis) one 3-bed and two 5-bed cluster flats,
and 32 residential studios (C3) and gym area, erection of two
2-storey rear extensions and demolition of existing rear extensions
for
Bargh Estates & CityBlock Ltd
Minutes:
|
16/00275/LB |
Listed building application for internal and external alterations to facilitate the phased change of use and conversion of bar, nightclub and shop (A1/A4) to student accommodation comprising four 7-bed, two 8-bed and one 9-bed cluster flats (sui generis) one 3-bed and two 5-bed cluster flats, and 32 residential studios (C3) and gym area, erection of two 2-storey rear extensions and demolition of existing rear extensions for Bargh Estates & CityBlock Ltd |
Bulk Ward |
A |
It was proposed by Councillor Helen Helme and seconded by Councillor Stuart Bateson:
“That the application be approved.”
Upon being put to the vote, Members voted unanimously in favour of the proposition, whereupon the Chairman declared the proposal to be carried.
Resolved:
|
That, subject to the referral to the Secretary of State resulting in no adverse response, Listed Building Consent be granted subject to the following conditions:
|
|
|
1. |
Standard 3 year timescale for Listed Building Consent. |
|
2. |
Works in accordance with approved plans. |
|
3. |
Building Recording. |
|
4. |
Details of external materials required: · New windows (colour and finish); · Front doors; · Rainwater goods; · Doors (colour and finish); · Conservation rooflights; · External vents and extraction; · Rear Glass façade materials, materials to be utilised for the lowering of the existing staircase; · New stone lintels, cills and details of lime putty for stone roof features; and · Retention of the stained glass windows adjacent to the main access door. |
|
5. |
Details of external works required: · Stonework repairs, including sample of mortar/pointing; · Replacement roof; · Cross sections of windows and transoms; · Removal of the external metal cage (covering stained glass) – Holes to be made good; · Details of any cleaning method (including stone and stained glass windows); and · Surfacing materials for rear amenity space |
|
6. |
Details of internal materials required: · New internal doors; · New staircases; · Transom panels; and · Mezzanine floors. |
|
7. |
Details of internal works required: · Works to staircase; · Schedule of repairs to decorative plasterwork; · Details of transom panel to mezzanine; · Details of structural steelwork required to create the mezzanine; and · Cast iron columns to be retained as detailed on plan. |