31 St Thomas Centre, Marton Street, Lancaster PDF 284 KB
Relevant Demolition of existing 2 storey
Church Centre building and erection of a replacement 2.5 storey
Church Centre building, including single storey lean-to and single
storey link to the adjacent Church and alterations to existing
carpark, including creation of steps and resurfacing
Minutes:
18/00405/FUL |
Relevant Demolition of existing 2 storey Church Centre building and erection of a replacement 2.5 storey Church Centre building, including single storey lean-to and single storey link to the adjacent Church and alterations to existing carpark, including creation of steps and resurfacing. |
Castle Ward |
A |
A site visit was held in respect of this item on 18th June 2018 minute 16 (2018/2019) refers.
It was proposed by Councillor Helen Helme and seconded by Councillor Sylvia Rogerson:
“That the application be approved.”
Upon being put to the vote, Members voted unanimously in favour of the proposition, whereupon the Chairman declared the proposal to be carried.
Resolved:
That Planning Permission be granted subject to the following conditions:
|
|
1. |
Standard three year timescale. |
2. |
Approved plans. |
3. |
Secure contract for construction prior to demolition. |
4. |
Archaeological watching brief. |
5. |
Arboricultural Method Statement. |
6. |
Contaminated land assessment and remediation. |
7. |
Drainage scheme. |
8. |
Scheme of highway improvement works: road widening; pedestrian links; road markings; review of street lighting to Peter Street and parking arrangements on Marton street. |
9. |
Materials/details including – stone; render; roofing materials; cladding; eaves verge and ridge details; rooflights; flues and vents; boundary treatments, including gates and fencing to churchyard; surfacing materials; windows and doors; window surrounds; barrier to car park; any repairs to the plaque; louvres; glazed extension to church. |
10. |
Landscaping Scheme. |
11. |
Development in accordance with Arboricultural Implications Assessment. |
12. |
Surfacing and marking to car park. |
13. |
Provision of cycle storage. |
14. |
Inclusion of existing plaque, as shown on the drawings. |
15. |
Hours of construction. |